Strategies To Preserve Life For Nuclear Power Plant Facilities Along the San Madrid Earthquake Fault Line

This article explains strategies for preserving life and enhancing public safety in the event of a random earthquake along the New Madrid Seismic Zone. The last earthquake and tremors in 1811-1812 lasted over a month and resulted in the loss of life and extensive property damage in states from Illinois through to Mississippi.

The difference between 1811 and now is that a greater population lives in this area alongside a considerable nuclear power plant infrastructure.  Therefore, strategies to preserve life and property need to be formulated and put into practice on a continuous basis. 1)

The states along the New Madrid Seismic Zone include Alabama, Arkansas, Illinois, Indiana, Kentucky, Mississippi, Missouri, and Tennessee. 1) Impacted reactors in these states are the subject of public safety oversight and regulatory review by the Nuclear Regulatory Commission. (NRC) These reactors include Nuclear I and II in Arkansas;  Braidwood 1 and 2 belonging to Exelon Generation in Joliet, Illinois; Dresden II and III belonging to Exelon Generation in Joliet Illinois; LaSalle I, II belonging to Exelon Generation Company in Ottawa, Illinois; Quad Cities I, II in Moline Illinois and Grand Gulf I Nuclear Station near Vicksburg, Mississippi among others. 2)

There are numerous implications for an earthquake along the San Madrid Earthquake Fault Line. These implications include civil, electrical and mechanical engineering for the infrastructure, the power grid, public safety and emergency shut down of nuclear reactors. The infrastructure includes all of the relevant roads leading into the nuclear reactor, as well as the coolant, drinking water wells, monitoring wells and piping infrastructure under the nuclear power plant.

The drinking water is a life preservation issue which impacts the local population
and ecosystem directly. Monitoring wells are in place to verify that tritium levels are within predefined legal limits. In addition, the operability of these monitoring wells is a continuous concern because the public needs to be informed of unsafe tritium levels on a continuous basis both before and after an earthquake event.

The NRC’s regulations are aimed at enhancing public safety by setting forth standards for systems necessary to operate the nuclear power plant or shut it down in case of an emergency or natural exigency. These safety systems’ buried piping is subject to rigorous routine inspection and testing requirements set forth in the NRC agency regulations, as well as from standards of the American Society of Mechanical Engineers. The most recent buried pipe leaks have involved water with above-normal levels of tritium. Tritium is a mildly radioactive isotope of hydrogen which is normally measured in picocuries (trillionths of a curie) per liter.  3)

A disaster recovery plan is necessary to ensure the continued operation of the nuclear power plant in the aftermath of an earthquake. The return to normal power grid operations is a primary life preservation issue in states like Alabama, Arkansas, Illinois, Indiana, Kentucky, Mississippi, Missouri and Tennessee which abut the San Madrid Earthquake Fault Line.

The Disaster Recovery Plan sets forth the recovery scheme which includes the organizational apparatus which is empowered to move the nuclear power plants back into safe operation together with the requisite standards for returning to normal operating conditions under the Nuclear Regulatory Commission requirements. The Information Technology Information Management Strategic Plan covers Disaster Recovery and Emergency Response in the use of new commercial wireless technologies in the first response, disaster response and continuity of operations.(COOP) 4)

The Contingency Plan sets forth the requisite people in an organization empowered to act in the event of a catastrophic event like an earthquake along the San Madrid Earthquake Fault Line. In addition, the plan sets forth the various suppliers to be contacted in an emergency,  the automatic shutdown sequences and automatic event escalation to the NRC to mitigate any dangers to the public health and safety.

About Dr Joseph S Maresca

I've taught approx. 34 sections of collegiate courses including computer applications, college algebra, collegiate statistics, law, accounting, finance and economics. The experience includes service as a Board Director on the CPA Journal and Editor of the CPA Candidates Inc. Newsletter. In college, I worked as a statistics lab assistant. Manhattan College awarded a BS in an allied area of operations research. The program included courses in calculus, ordinary differential equations, probability, statistical inference, linear algebra , the more advanced operations research, price analysis and econometrics. Membership in the Delta Mu Delta National Honor Society was granted together with the degree. My experience includes both private account and industry. In addition, I've worked extensively in the Examinations Division of the AICPA from time to time. Recently, I passed the Engineering in Training Exam which consisted of 9 hours of examination in chemistry, physics, calculus, differential equations, linear algebra, probability/ statistics, fluids, electronics, materials science/structure of matter, mechanics, statics, thermodynamics, computer science, dynamics and a host of minor subject areas like engineering economics. A very small percentage of engineers actually take and pass the EIT exam. The number has hovered at circa 5%. Several decades ago, I passed the CPA examination and obtained another license in Computer Information Systems Auditing. A CISA must have knowledge in the areas of data center review, systems applications, the operating system of the computer, disaster recovery, contingency planning, developmental systems, the standards which govern facility reviews and a host of other areas. An MBA in Accounting with an Advanced Professional Certificate in Computer Applications/ Information Systems , an Advanced Professional Certificate in Finance and an Advanced Professional Certificate in Organizational Design were earned at New York University-Graduate School of Business (Stern ). In December of 2005, an earned PhD in Accounting was granted by the Ross College. The program entrance requires a previous Masters Degree for admittance together with a host of other criteria. The REGISTRAR of Ross College contact is: Tel . US 202-318-4454 FAX [records for Dr. Joseph S. Maresca Box 646 Bronxville NY 10708-3602] The clinical experience included the teaching of approximately 34 sections of college accounting, economics, statistics, college algebra, law, thesis project coursework and the professional grading of approx. 50,000 CPA examination essays with the American Institute of Certified Public Accountants. Additionally, membership is held in the Sigma Beta Delta International Honor Society chartered in 1994. Significant writings include over 10 copyrights in the name of the author (Joseph S. Maresca) and a patent in the earthquake sciences.